Complete Bathroom Renovations Across Perth

We manage bathroom renovations end to end, from stripping out the old room to the final bead of silicone. One team, one point of accountability, and no gaps between trades where responsibility gets lost.

Most of what determines whether a bathroom lasts happens before a single tile is visible. We screed the floor with correct falls to the waste, waterproof to Australian Standard AS 3740, and allow full cure times even when it would be faster not to. That discipline is why our finished rooms still look right in ten years, not two.

Whether it’s a compact ensuite, a main family bathroom or a full wet-room rebuild, you get meticulous planning, honest advice on materials, and a finish detailed to the millimetre.

What’s Involved

Every renovation starts with a free site assessment. We walk the space with you, discuss layout, tile format and finishes, and give you a clear itemised quote covering the full scope — not a lump sum you can’t interrogate.

From there we handle demolition and waste removal, screeding, waterproofing, tiling, grouting and silicone. We coordinate around your plumber and electrician so the sequence runs without dead days, and we keep the site contained and clean throughout, because you’re usually still living in the house while we work.

  • AS 3740 Certified Waterproofing
  • Laser-Levelled Floors & Falls
  • Mitred Edge Detailing
  • Clean, Contained Work Site

Most complete bathroom renovations run two to four weeks depending on scope, trade sequencing and waterproofing cure times. You’ll get a projected timeline in writing before work starts, and you’ll hear from us immediately if anything changes. Call 0459 074 402 to book a free site measure.

FAQs

How much does a bathroom renovation cost in Perth? It depends on the size of the room, whether the layout changes, the standard of fixtures and how much waterproofing and structural work is required. A straightforward ensuite refresh sits well below a full rebuild with relocated plumbing. We provide a detailed itemised quote after a free site measure so you can see exactly what drives the figure.

How long will my bathroom be out of action? Two to four weeks for a complete renovation, depending on scope and cure times. We give you a projected timeline before we start and keep you updated if anything shifts.

Do I need to move out during the renovation? Almost never. Most clients stay in the home. We contain dust, remove waste daily and keep the rest of the house clean — though if it’s your only bathroom, we’ll talk through the sequencing with you upfront.

contact

Reach out &
Connect with Us

Our vision is to provide innovative, independent flooring solutions that solve problems for homes, industries, and workspaces, as well as flooring we would like in our own residences, work spaces,

Get In Touch With Us And Enjoy
Top-Notch Support

    WA Tiles Experts WA Tiles Experts